By TriStar Planroom in Roadwork / Paving — 16 Nov 2026 2026-11-12-36: CN262079 - Resurfacing on I-40 from Falling Water River (L.M. 23.96) to the ramp from U.S. 70N (S.R. 24) (L.M. 33.33) This post is for paying subscribers only Subscribe now Already have an account? Sign in.