Topic
Roadwork / Paving
Roadwork / Paving repairs and resurfaces streets to improve safety, extend roadway life, and ensure smoother travel.
2026-0918-04: SR12/Excell Rd Intersection Improvements
2026-0910-15: 2026-0901 - Full Depth Reclamation
2026-0910-13: 437-0909-09 - ITB - Bridge Replacement over Lytle Creek
2026-0910-12: CN263065 - The construction of a concrete Bulb-Tee beam bridge on Cedar Grove Road over Hurricane Creek (L.M. 0.49), including grading, drainage, and paving.
State of Tennessee - Department of Transportation (TDOT)
Scope of work: 105-01 CONSTRUCTION STAKES, LINES AND GRADES (1) LS. 109-10.01 TRAINEE 1,100.000 HOUR. 201-01 CLEARING AND GRUBBING (1) LS. 202-04.02 REMOVAL OF STRUCTURES (DESCRIPTION, STA.) (CONCRETE DITCHES) (1) LS. 202-04.03 REMOVAL