TriStar Planroom
2026-0911-05: 200994 - Temporary Fencing Emergency Same-Day Installation
2026-0911-04: COG2027-09 - COG2027-09 LED STREETLIGHT CONVERSION
2026-0911-03: 40100-13998 - TDOT Portable Restrooms and Septic Service
2026-0911-02: 369/005-05-2024 - COM Bldg 2 Learning Community Renovation
2026-0910-16: RFQ 2027-05 - Kingston Pike Corridor Study (Municipal Center Drive / Jamestowne Boulevard Connectivity
2026-0910-15: 2026-0901 - Full Depth Reclamation
2026-0910-14: 2707 - Fire Sprinkler Repairs
2026-0910-13: 437-0909-09 - ITB - Bridge Replacement over Lytle Creek
2026-0910-12: CN263065 - The construction of a concrete Bulb-Tee beam bridge on Cedar Grove Road over Hurricane Creek (L.M. 0.49), including grading, drainage, and paving.
State of Tennessee - Department of Transportation (TDOT)
Scope of work: 105-01 CONSTRUCTION STAKES, LINES AND GRADES (1) LS. 109-10.01 TRAINEE 1,100.000 HOUR. 201-01 CLEARING AND GRUBBING (1) LS. 202-04.02 REMOVAL OF STRUCTURES (DESCRIPTION, STA.) (CONCRETE DITCHES) (1) LS. 202-04.03 REMOVAL