2026-F3XH: Concrete Culverts – Indian Ridge Roundabout (ITQ #2025-29)

Johnson City

Deadline: 12/5/2025 End of Day CT

Status: Open

Description: City of Spring Hill Address: 199 Town Center Parkway, Spring Hill, TN 37174 Phone: 9314862252 Contact: Amanda Knobloch Email: aknobloch@springhilltn.org The work covered by this item shall consist of design, provision, and installation of play equipment at Harvey Park located at 4001 Miles Johnson Parkway in Spring Hill, TN as well as raising the play area a minimum of one (1) foot over existing elevation to mitigate rising water from the creek. Design shall include drainage and grading plans to include, but not be limited to, grading elevations and drainage calculations. Removal of the existing equipment and any site preparations shall be included. Existing lighting along the walking path should remain; existing lighting not associated with the walking path should be addressed in this proposal.


Pre-Bid Meeting Details:

Additional Information: https://www.johnsoncitytn.org/bid_detail_T4_R508.php


Subscribe to TriStar Planroom

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe