2026-0807-06: Maple Road Bridge Channel Improvement
Town of Atoka
Scope of work: 1. Remove existing rip rap and regrade channel slope. 2. Install two sheet pile grade control structures. 3. Shift existing bridge abutment wall panel. 4. Fill void beneath existing wall panel with concrete. 5. Pave hot mix asphalt surface pavement. 201-01 CLEARING AND GRUBBING LS 1 203-01.06 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) LS 1 209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING) L.F. 200 403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC) TON 0.2 411-01.10 ACS MIX(PG64-22) GRADING D TON 43 604-01.01 CLASS A CONCRETE (ROADWAY) C.Y. 5 606-24.10 SHEET PILES S.F. 860 709-05.09 MACHINED RIP-RAP (CLASS C) TON 200 712-01 TRAFFIC CONTROL LS 1 717-01 MOBILIZATION LS 1 801-01 SEEDING (WITH MULCH) UNIT 2